The QA department is a very importment Dept. for every high quality company, our company have a very strong QA team. They always help the project team control every case, they control each case from the start to the end, they will make many steps' report for each case, once a case meet a problem, they will provide some good helps to the project team.
Each of them know the QA procedure very well, and also they can use many measuring tools.
Our QA team have an advantage compare with other company that is some of them know the mold and production knowledge very well.
MAIN QA PROCEDURE
1. Mould Design Control.
2. Mould Steel Hardness Inspection.
3. Mould Electrodes Inspection.
4. Mould Core and Cavity Steel Dimension Inspection.
5. Mould Pre-Assembly Inspection.
6. Mould Trial Report and Samples Inspection.
7. Mould Pre-Shipment Final Inspection.
8. Export Mould Package Inspection.
Our QA tools as below,
Name |
Type |
Qty. |
Push & pull power machine |
50KGF |
1 |
Actinometer machine |
TMS-724 |
1 |
Electron vernier caliper |
600mm |
2 |
Scale vernier caliper |
600mm |
2 |
Electron vernier caliper |
300mm |
2 |
Caliper gauge |
1.0mm-4.5mm |
1 |
2D inspection via projector |
|
1 |
Hardness tester |
|
1 |
Height Gauge |
|
2 |
Gap Gauge |
|
2 |
Depth Vernier |
|
1 |
Radius Gauge |
|
3 |
Micrometer |
|
3 |
Pin Gauge |
|
2 |
|